Decisions 2012

 

Decisions V_496_2012

Decisions V_492_2012 
On Notification for Preliminary Authorization for enterprise “Drini i Bardhë” JSC

Decisions V_490_2012 
On Notification for Preliminary Authorization for enterprise  “Triangle General Contractors- Inc” Branch Kosova

Decisions V_489_2012
On Notification for Preliminary Authorization for enterprise “Matkos Group” sh.p.k

Decisions V_488_2012
On EXTENSION of the validity of the Decision on Notification for Preliminary Authorization V_296_2010 dated November 11th, 2010 (two years duration), for a period of six (6) months, respectively until May 11th, 2013, for enterprise “Kelkos-Energy” JSC

Decisions V_487_2012
On APPROVAL of the Request for withdrawal of Application for construction of new generation capacity from wind for the "Wind Park-Zatriç" project, with an installed capacity of 30 MW, MA Rahovec, of the enterprise "NEK UMWELTTECHNIK AG" Branch in Kosovo

Decisions V_486_2012
On ISSUANCE of the License on electricity import and export to the enterprise "HEP - KS" JSC

Decisions V_485_2012
On APPROVAL of the district heating tariffs for the District Heating (DH) Gjakova J.S.C. for the heating season 2012/2013

Decisions V_484_2012
On APPROVAL of the district heating tariffs for the District Heating (DH) Termokos J.S.C. for the heating season 2012/2013

Decisions V_466_2012
On APPROVAL of the Methodology for preparation of Energy Balance, issued on 12th of October 2012

Methodology preparation of energy balance

Decisions V_465_2012
On REJECTION of granting of preliminary authorization to the enterprise "United Albania Energy" LLC, issued on 12th of October 2012

Decisions V_464_2012
On REJECTION of granting of preliminary authorization to the enterprise "United Albania Energy" LLC, issued on 12thof October 2012

Decisions V_463_2012
On REJECTION of granting of preliminary authorization to the enterprise "GROUP DEVOLLI" LLC, issued on 12thof October 2012

Decisions V_462_2012
On REJECTION of granting of preliminary authorization to the enterprise "GROUP DEVOLLI" LLC, issued on 12thof October 2012

Decisions V_461_2012
On ENDING of the period of validity of Decision on Notification for Preliminary Authorization, for enterprise KTW shpk –SHTIME, issued on 12th of October 2012

Decisions V_460_2012 
On MODIFICATION of the License for distribution of district heating (with conditions) given to the District Heating Termokos JSC, issued on 12th of October 2012

Decisions V_459_2012
On MODIFICATION of the License for Distribution of district heating (with conditions) given to the District Heating Gjakova JSC, issued on 12th of October 2012

Decisions V_458_2012 
On MODIFICATION of the License for Public Supply of district heating (with conditions) given to the District Heating Gjakova JSC, issued on 12th of October 2012

Decisions V_457_2012 
On MODIFICATION of the License for Public Supply of district heating (with conditions) given to the District Heating Termokos JSC, issued on 12th of October 2012

Decisions V_456_2012 
On MODIFICATION of the License for Generation of district heating (with conditions) given to the District Heating Termokos JSC, issued on 12th of October 2012

Decisions V_455_2012 
On MODIFICATION of the License for Generation of district heating (with conditions) given to the District Heating Gjakova JSC, issued on 12th of October 2012

Decisions V_454_2012
On APPROVAL of the "Distribution System Planning and Security Standards", of the DH Termokos J.S.C., issued on 12th of October 2012

Decisions V_453_2012
On EXTENSION of the License for import and export electricity of the enterprise "GEN-I TIRANA" L.L.C. KOSOVO BRANCH, issued on 12th October 2012

Decisions V_452_2012 
On MODIFICATION of the license for supply / trade of electricity provided to the enterprise "GEN-I Tirana number", issued on 12th of October 2012

Decisions V_451_2012
On RELEASE of all licensees in the Energy Regulatory Office (ERO) from the annual fee payment, issued on 1st of October 2012

Decisions V_437_2012
On RENEWAL of the license for generation of electricity of the Kosovo Energy Corporation enterprise - Generation Division “KEK J.S.C.” – TPP Kosova A, with license number ZRRE/Li_05/12_A, for the period from 04 October 2012 to 04 October 2013

Decisions V_409_2012 
On APPROVAL of retail electricity tariffs for regulated consumers to be implemented by KEK J.S.C., from 1 June 2012

Decisions V_408_2012 
On APPROVAL of the Maximum Allowed Revenues (MAR) to be recovered from regulated prices charged by the licensed operator of the Kosovo A Power Plant and the licensed operator of the Kosovo B Power Plant

Decisions V_407_2012 
On APPROVAL of the Maximum Allowed Revenues (MAR) to be recovered from regulated tariffs and charges to be applied by the Kosovo Transmission System and Market Operator JSC (KOSTT)

Decisions V_406_2012
On APPROVAL of the Maximum Allowed Revenues (MAR) to be recovered from regulated tariffs and charges that will be applied by the licensed Distribution System Operator (DSO)

Decisions V_404_2012
On APPROVAL of Amendments of provisions of Article 6.3.1.1 and 6.6.1.3 of the Connection Code

Decisions V_403_2012 
On APPROVAL of the transfer of assets 400/220/110 kV including also the transformers 220/35/10 (20) kV, as well as lands, buildings, subsidiary equipment and employees from KEK J.S.C., to KOSTT J.S.C.

Decisions V_402_2012
On ISSUANCE of authorizationto the company “Kelkos-Energy” L.L.C., for constructing new generating capacities for the production of hydro electricity

Decisions V_400_2012
On APPROVAL of the request of KOSTT related to payment of bills from KEK for the months of November and December 2010.

Decisions V_399_2012
On the Weighted Average CapitalCost

Decisions V_396_2012 
On ALLOWANCE of KEK J.S.C. to derogate the application of some articles of Licenses