Decision V_605_2013
On APPROVAL of the amending of the procedure on reading and billing tariff customers through Annex 1, valid only for the customers of the District of Ferizaj, read by hand-held units (Pilot Project).

Decision V_604_2013
On notification for Preliminary Authorization for “AIR -ENERGY” L.L.C enterprise

 

Decision V_601_2013
On approval of "Market rules"

Decision V_600_2013
On allowing KOSTT J.S.C. derogation from implementation of provisions of the Grid Code and the Transmission System Operator License

Decision V_587_2013
On approval of the Amendments of the Grid Code

Decision V_586_2013
On approval of the Amendments of the Electrical Equipment Code

Decision V_585_2013
On APPROVING the tariffs of the district heating for the District Heating (DH) Gjakova J.S.C. for the heating season 2013/2014

Decision V_584_2013
On APPROVING the tariffs of the district heating for the District Heating (DH) Termokos J.S.C. for the heating season 2013/2014

Decision V_583_2013
On approving the document “Distribution System Security and Planning Standards” 

Decision V_582_2013
On approving the document “Transmission Development Plan 2014 – 2023” 

Decision V_581_2013
On APPROVING the request of Kosovo Electricity Distribution and Supply Company (KEDS) to initiate a pilot project on reading and billing of electricity meters by Held Hand Unit (HHU) in the District of Ferizaj, starting from January 01st, 2014.

Decision V_571_2013
EJECTING the granting of preliminary authorization to the enterprise “Matkos Group” LLC., for the construction of the “HC Brod” with an installed capacity of 2.5 MW, in the Lepenc River, Municipality of Shtërpce, Republic of Kosovo.

Decision V_570_2013
On APPROVING  the amendment of the document “Transmission Connection Charging Methodology” of KOSTT J.S.C..

Decision V_569_2013
On Issuing the AUTHORIZATION to the enterprise “Hydro - Line” LLC., for construction of the new electricity generation capacities from water, HPP Albaniku 3, with an installed capacity of 4.267 kW, at the location "Dolac", CZ Dolac, the place called Thanishte/Ovqar, Municipality of Mitrovica.

Decision V_568_2013
On Issuing the AUTHORIZATION to the enterprise “Kelkos-Energy” LLC, for construction of the new electricity generation capacities from water, HPP Lumëbardhi II., with an installed capacity of 5.5 MW, generation capacity to be placed in the location of Deçan River, Municipality of Deçan.

Decision V_567_2013
On APPROVAL  of the request for withdrawal of application for construction of hydro power plant in Lumbardhë River, HPP Reçan, with a capacity of 2.2 MW, Municipality of Prizren, by the enterprise "Triangle General Contractors" inc., Branch in Kosovo.
REJECTING the granting of preliminary authorization to the enterprise “Triangle General Contractors” Inc., Branch in Kosovo, for construction of hydro power plant in Lumbardhë River, HPP Reçan, with a capacity of 2.2 MW, Municipality of Prizren, Republic of Kosovo.

Decision V_566_2013
On APPROVAL of the Request for withdrawal of application for construction of hydro power plant in Lepenc River, HPP Lepence with a capacity of 5.2 MW, Municipality of Shtërpce, by the enterprise "Triangle General Contractors" inc., Branch in Kosovo.
REJECTING the granting of preliminary authorization to the enterprise “Triangle General Contractors” Inc., Branch in Kosovo, for construction of hydro power plant in Lepenc River HPP Lepence with a capacity of 5.2 MW, Municipality of Shtërpce, Republic of Kosovo. 

Decision V_565_2013
On APPROVAL of the request for withdrawal of the Application for construction of hydro power plant in Lepenc River, HPP Shtërpce, with a capacity of 3.6 MW, Municipality of Shtërpce, by the “Triangle General Contractors” Inc., Branch in Kosovo.
REJECTING the granting of preliminary authorization to the enterprise “Triangle General Contractors” Inc., Branch in Kosovo, for construction of hydro power plant in Lepenc River HPP Shtërpce with a capacity of 3.6 MW, Municipality of Shtërpce, Republic of Kosovo.

Decision V_559_2013
On Notification for Preliminary Authorization for “Era Energji” L.L.C. enterprise, at the location  WindPark – Krajkova, Drenas Municipality

Decision V_558_2013
On Notification for Preliminary Authorization for “Hidroenergji” L.L.C. enterprise, at the location “Sllatinë”, Kaçanik Municipality.

Decision V_557_2013
On Notification for Preliminary Authorization  for “Hidroenergji” L.L.C. enterprise,  at the location “Uji i Thartë”, Elezit Hani Municipality.

Decision V_556_2013
On EXTENTION of license for electricity generation to Kosovo Energy Corporation – Generation Division (KEK J.S.C.) – TPP Kosovo A.

Decision V_555_2013
On AMENDMENT of license for electricity generation (CHAPTER I) granted to Kosovo Energy Corporation (KEK J.S.C.), Generation Division “TPP Kosovo B”.

Decision V_554_2013
On AMENDMENT of license for electricity generation (CHAPTER I) granted to Kosovo Energy Corporation (KEK J.S.C.), Generation Division “TPP Kosovo A”.

Decision V_553_2013

Decision V_545_2013
On APPROVAL of the “DISTRIBUTION CODE” of the District Heating Termokos JSC.

Decision V_544_2013
On EXEMPTING all the licensees in the Energy Regulatory Office (ERO) from the annual fee payment for the period from November 01st, 2012 to April 30th, 2013.

Decision V_543_2013
On TERMINATION of the validity of the Decision on Preliminary Authorization V_365_2011 dated April 28th, 2011 for enterprise “Kelkos-Energy” LLC.

Decision V_542_2013
On Notification for Preliminary Authorization for the “UPWIND International II GmbH –Branch in Kosovo” company, for the development of the project for the construction of new generation capacities from wind, at the location “WindPark – Budakova”, with an installed capacity of 30 MW, Municipalities of Suhareka, Ferizaj and Shterpce

Decision V_541_2013
On Notification for Preliminary Authorization for the “Matkos Group” LLC company, for the development of the project for the construction of new generation capacities from water, in the Lepenc River, consisting of three (3) generation units; HPP “Shterpce” with a capacity of 2.47 MW, HPP “Bitinja” 2.1 MW, HPP “Vica” 2.5 MW, a total of 7.07 MW, Municipality of Shterpce  (osht i publikum dy here)

Decision V_540_2013
On Notification for Preliminary Authorization for “Matkos Group” LLC company, for the development of the project for the construction of new generation capacities from water, in the Lepenc River, consist