V_1339_2020 - Approval of the document “Evaluation of competition in the electricity market in Kosovo 2018-2019

EVALUATION OF COMPETITION IN THE ELECTRICITY MARKET IN KOSOVO 2018-2019


V_1338_2020 - Approval of the amendment of the document “Distribution Code” as in appendix of this decision;

Distribution Code


V_1337_2020 - Approval of the amendment of the document “Electricity Metering Code of Distribution System Operator” as in appendix of this decision;

Electricity Metering Code of Distribution System Operator


V_1336_2020 - Approval of the document “Annual Balance of Electricity 2021”


V_1332_2020 - Approval in Principle- of the request of KOSTT to assign and/or transfer some rights and obligations to ALPEX for the organization of the day-ahead and intraday market for the territory of the Republic of Kosovo.


V_1331_2020 - Approval of Long-term Thermal Energy Balance, for the period 2021-2030 of NP Termokos JSC;

LONG-TERM THERMAL ENERGY BALANCE_ 2021-2030;


V_1330_2020 - Approval of Annual Thermal Energy Balance for 2021 of NP Termokos  JSC

Annual Thermal Energy Balance for 2021


V_1329_2020 - Approval of Long-Term Thermal Energy Balance for the period 2021-2030 of NP District Heating of Gjakova JSC

Long-term Thermal Energy Balance_ 2021-2030


V_1328_2020 - Approval of Annual Thermal Energy Balance for 2021 of NP District Heating of Gjakova JSC

Annual Thermal Energy Balance 2021


V_1327_2020 - APPROVAL of the request of the applicant N.SH.T “AGRO CELINA” for construction of new generation capacities for self-consumption from solar/photovoltaic panels in the facility in cadastral area No. 01039-0, 01040-0 and 01042-0 CA Xërxe, with an installed capacity of 14.99 kW, in Municipality of Rahovec.


V_1326_2020 - APPROVAL of the request of the natural person applicant Fatmir Bellaqa for construction of new generation capacities for self-consumption from solar/photovoltaic panels in the facility in cadastral area No. 128-0 CA Pataqan i Epërm, with an installed capacity of 5 kW, in Municipality of Rahovec.


V_1325_2020 - APPROVAL of the request of the natural person applicant Berat Buzhala for construction of new generation capacities for self-consumption from solar/photovoltaic panels in the facility in cadastral area No. 316-26 CA Çagllavicë, with an installed capacity of 5 kW, in Municipality of Pristina.


V_1324_2020 - APPROVAL of the request of the applicant “RREZE COMPANY” LLC for construction of new generation capacities for self-consumption from solar/photovoltaic panels in the facility in cadastral area No. 00459-2 CA Polac i Ri, with an installed capacity of 75.53 kW, in Municipality of Skenderaj.


V_1323_2020 - APPROVAL of the request of the natural person applicant Mark Coli for construction of new generation capacities for self-consumption from solar/photovoltaic panels in the facility in cadastral area No. 666/10 CA Klinë, with an installed capacity of 8 kW, in Municipality of Klina.


V_1322_2020 - APPROVAL of the request of the applicant “KOSHI GROUP” LLC for construction of new generation capacities for self-consumption from solar/photovoltaic panels in the facility in cadastral area No. 415-3 CA Prizren in St. “Tranziti”, with an installed capacity of 100 kW, in Municipality of Prizren.


V_1321_2020 -TERMINATION – of the application of the Support Scheme with Feed-in Tariffs for supporting the construction of new generation capacities for electricity generation from Renewable Energy Sources (RES)


V_1320_2020 -  Approval of KOSTT’s document “Transmission Development Plan 2020-2029”


V_1319_2020 -  Approval of the document “Harmonized allocation rules for long‐term transmission rights”


V_1318_2020 -  Approval of the document “Methodology on Rules for Dimensioning the FRR in the LFC AK Block”


V_1317_2020 -  Approval of the document “Procedure for Allocation of Interconnection Capacities”


V_1316_2020 - APPROVAL of the Amendment of “Heat Supply Agreement, concluded on 24.12.2014, no.252” between KEK-Kosovo Energy Corporation JSC and DH Termokos JSC.;


V_1315_2020 - APPROVAL of thermal energy tariffs for final customers of the District Heating (DH) Gjakova JSC for the heating season 2020/2021, which shall be implemented from the date of issuance of this Decision;


V_1312_2020 - APPROVAL- of the request of the natural person applicant S.T for construction of new generation capacities for self-consumption from solar/photovoltaic panels, with an installed capacity of 5 kW, in Municipality of Deçan;


V_1311_2020 - APPROVAL- of the request of the natural person applicant SH.H for construction of new generation capacities for self-consumption from solar/photovoltaic panels, with an installed capacity of 5 kW, in Municipality of Malisheva;


V_1310_2020 - APPROVAL- of the request of the applicant “ SOLID GROUP”  for construction of new generation capacities for self-consumption from solar/photovoltaic panels, with an installed capacity of 80 kW, in Municipality of Graqanica;


V_1309_2020 - APPROVAL- of the request of the applicant “ SOLID GROUP”  for construction of new generation capacities for self-consumption from solar/photovoltaic panels, with an installed capacity of 5 kW, in Municipality of Graqanica;


V_1308_2020 - APPROVAL- of the request of the applicant “ SOLID GROUP”  for construction of new generation capacities for self-consumption from solar/photovoltaic panels, with an installed capacity of 15 kW, in Municipality of Graqanica;


V_1307_2020 - APPROVAL- of the request of the applicant “MAXX GROUP” LLC for construction of new generation capacities for self-consumption from solar/photovoltaic panels, with an installed capacity of 15 kW, in Municipality of Graqanica;


V_1306_2020 - APPROVAL- of the request of the applicant N.T.P “Plus” for construction of new generation capacities for self-consumption from solar/photovoltaic panels, with an installed capacity of 100 kW, in Municipality of Lipjan;


V_1305_2020 - APPROVAL- of the request of the natural person applicant Gj.B for construction of new generation capacities for self-consumption from solar/photovoltaic panels, with an installed capacity of 8 kW, in Municipality of Pristina;


V_1296_2020 - APPROVAL of the request of KOSTT JSC for Derogation of the Long-Term Electricity Balance and Generation Adequacy Plan;


V_1291_2020 - Issuance of Electricity Wholesale Supply(Trade) License to BINDI INTEGRATED SERVICES LLC
License-Electricity Wholesale Supply Trade License issued to the company BINDI INTEGRATED SERVICES LLC.


V_1290_2020 - Extension of electricity generation license of Kosovo Energy Corporation- Generation Division (KEK JSC)- TPP Kosova A
License Electricity generation license, issued to KEK JSC- TPP Kosova A


V_1289_2020 - APPROVAL - of the request of the applicant "GREEN HOUSE" LLC, for construction of new generation capacities for self-consumption from solar/photovoltaic panels, in Municipality of Peja;


V_1288_2020 - APPROVAL – of the request of the natural person applicant Luan Shllaku, for construction of new generating capacities for self-consumption from solar/photovoltaic panels, in Municipality of Gjakova;


V_1287_2020 - APPROVAL – of the request of the natural person applicant Besim Gashi for construction of new generating capacities for self - consumption from solar/photovoltaic panels, in Municipality of Peja;


V_1286_2020 - APPROVAL – of the request of the natural person applicant Besim Latifaj for construction of new generating capacities for self - consumption from solar/photovoltaic panels, in Municipality of Prishtina;


V_1285_2020 - APPROVAL – of the request of the applicant “KAN” LLC, for construction of new generating capacities for self-consumption from solar/photovoltaic panels, in Municipality of Gracanica;


V_1284_2020 - APPROVAL – of the request of the natural person applicant Nol Pashoja, for construction of new generating capacities for self-consumption from solar/photovoltaic panels, in Municipality of Prishtina;


V_1283_2020 - APPROVAL – of the request of the natural person applicant Nol Pashoja, for construction of new generating capacities for self-consumption from solar/photovoltaic panels, in Municipality of Prishtina;


V_1276_2020 - APPROVAL – of the request of Distribution System Operator (DSO) for amendment of coefficients of  DSO losses;


V_1275_2020 - APPROVAL – of the request of the applicant "VIER PFOTEN KOSOVA", for construction of new generation capacities for self-consumption from solar/photovoltaic panels, in Municipality of Prishtina;


V_1274_2020 - APPROVAL – of the request of the natural person applicant Osman Robaj for construction of new generation capacities for self-consumption from solar/photovoltaic panels, in Municipality of Malisheva;


V_1273_2020 - APPROVAL - of the request of the applicant "GNTC GROUP" JSC, for construction of new generation capacities for self-consumption from solar/photovoltaic panels, in Municipality of Ferizaj;


V_1272_2020 - APPROVAL – of the request of the applicant N.T. "LIRIDONI", for construction of new generation capacities for self-consumption from solar/photovoltaic panels, in Municipality of Peja;


V_1271_2020 - APPROVAL – of the request of the natural person applicant Z. M. for construction of new generation capacities for self-consumption from solar / photovoltaic panels, in Municipality of Rahovec;


V_1270_2020 - APPROVAL -of the request of the applicant “D&Z” LLC, for construction of new generation capacities for self-consumption from solar/photovoltaic panels, in Municipality of Gjakova;


V_1269_2020 - APPROVAL of the "Procedure for Review of Customer Complaints and Requests" of  DH "Termokos" JSC; 


V_1268_2020  Decision on Extension of the term for provision of Public Service Obligation, imposed to the electricity supply licensee Kosovo Electricity Supply Company KESCO, for the period 27.04.2017 until 31.03.2021


V_1267_2020_Decision on issuance of license for generation of electricity from RES, HPP “Lepenci 3”, with a capacity of 9.98 MW, “Hidroenergji” LLC
Electricity Generation License "Hidroenergji" LLC


V_1266_2020_Decision on approval of the request of KOSTT JSC for derogations of provisions of Grid Code, Market Rules and TSO License


V_1265_2020_Decision on approval of the request of Distribution System Operator on amendment of the coefficients of DSO losses


V_1264_2020_ Decision on approval of the request of KOSTT JSC for amendment of the document “Market Rules Procedure for Correction of Metering”


V_1263_2020 Decision on approval of the document Reviewed Annual Balance of Electricity 2020


V_1262_2020_Decision on approval of the amendment of the document Rule and Methodology on Preparation of Electricity and Thermal Energy Balances
Rule and Methodology on Preparation of Electricity and Thermal Energy Balances


V_1261_2020 Decision on approval of the document Rule on Wholesale Energy Market Integrity and Transparency;


V_1256_2020 on APPROVAL of the appointment of Avni Alidemaj as Distribution System Operator Compliance Officer, appointed from the Executive Board of DSO (KEDS JSC)


V_1255_2020 on APPROVAL of the request of the applicant “BALLKAN PETROL” LLC, for construction of new generating capacities for self-consumption from solar/photovoltaic panels with an installed capacity of 83.3 kW, to be placed over the facility, in Municipality of Ferizaj.


V_1254_2020 on APPROVAL of the request of the applicant “Municipality of Obiliq”, for construction of new generating capacities for self-consumption from solar/photovoltaic panels, with an installed capacity of 16.32 kW, in Municipality of Obiliq.


V_1253_2020 on APPROVAL of the request of the natural person applicant Hashim Jonuzaj, for construction of new generating capacities for self-consumption from solar/photovoltaic panels, with an installed capacity of 10 kW, in Municipality of Prizren.


V_1252_2020 on APPROVAL of the request of the applicant “GELI” LLC, for construction of new generating capacities for self-consumption from solar/photovoltaic panels, , with an installed capacity of 10 kW to be placed over the facility, in the Municipality of Gjakova.


V_1251_2020 on ISSUANCE of Electricity wholesale supply (trading) license to “Balkan Energy” LLC,for the period from 23 June 2020 to 22 June 2025, with a capacity of 200 MW
Electricity Wholesale Supply (Trade) License "Balkan Energy" LLC


V_1244_2020 - APPROVAL- of the request of the applicant "Samiri-I-H&A" LLC for construction of new generation capacities for self-consumption from solar/photovoltaic panels, with an installed capacity of 8.4 kW, Municipality of Rahovec. 


V_1240_2020 - APPROVAL OF MAXIMUM ALLOWED REVENUES (hereinafter MAR) for the Universal Service Supplier (USS/KESCO)


V_1239_2020 - APPROVAL OF MAXIMUM ALLOWED REVENUES (hereinafter MAR) to be recovered from the licensed Distribution System Operator (DSO) KEDS JSC.


V_1238_2020 - APPROVAL OF MAXIMUM ALLOWED REVENUES (hereinafter MAR) to be recovered from the Transmission


V_1223_2020-APPROVAL of Distribution System Operator Compliance Programme (KEDS JSC.)